Laporan Biaya Perkara
NO | URAIAN | SALDO AWAL | PENERIMAAN | PENGELUARAN | SALDO AKHIR | KAS DI BANK | KAS DI BRANGKAS |
1 | Biaya Perkara | 105.704.022 | 17.020.000 | 20.352.000 | 102.372.022 | 99.493.732 | 2.878.290 |
2 | Biaya Eksekusi | 125.180.575 | 57.000.000 | 15.801.000 | 166.379.575 | 166.379.575 | 0 |
3 | Biaya Konsinyasi | 7.668.044 | 0 | 0 | 7.668.044 | 7.668.044 | 0 |
4 | Uang Titipan Perkara Pidana | 0 | 0 | 0 | 0 | 0 | 0 |
5 | PHI | 0 | 0 | 0 | 0 | 0 | 0 |
Jumlah | 238.552.641 | 74.020.000 | 36.153.000 | 276.419.641 | 273.541.351 | 2.878.290 |
NO | URAIAN | SALDO AWAL | PENERIMAAN | PENGELUARAN | SALDO AKHIR | KAS DI BANK | KAS DI BRANGKAS |
1 | Biaya Perkara | 103.131.022 | 24.595.000 | 22.022.000 | 105.704.022 | 105.112.732 | 591.290 |
2 | Biaya Eksekusi | 133.459.575 | 10.000.000 | 18.279.000 | 125.180.575 | 125.180.575 | 0 |
3 | Biaya Konsinyasi | 7.668.044 | 0 | 0 | 7.668.044 | 7.668.044 | 0 |
4 | Uang Titipan Perkara Pidana | 0 | 0 | 0 | 0 | 0 | 0 |
5 | PHI | 0 | 0 | 0 | 0 | 0 | 0 |
Jumlah | 244.258.641 | 34.595.000 | 40.301.000 | 238.552.641 | 237.961.351 | 591.2910 |
NO | URAIAN | SALDO AWAL | PENERIMAAN | PENGELUARAN | SALDO AKHIR | KAS DI BANK | KAS DI BRANGKAS |
1 | Biaya Perkara | 101.739.022 | 12.990.000 | 11.598.000 | 102.131.022 | 98.215.732 | 4.915.290 |
2 | Biaya Eksekusi | 155.711.575 | 0 | 22.252.000 | 133.459.575 | 133.459.575 | 0 |
3 | Biaya Konsinyasi | 7.668.044 | 0 | 0 | 7.668.044 | 7.668.044 | 0 |
4 | Uang Titipan Perkara Pidana | 0 | 0 | 0 | 0 | 0 | 0 |
5 | PHI | 0 | 0 | 0 | 0 | 0 | 0 |
Jumlah | 265.118.641 | 12.990.000 | 33.850.000 | 244.258.641 | 239.343.351 | 4.915.290 |
NO | URAIAN | SALDO AWAL | PENERIMAAN | PENGELUARAN | SALDO AKHIR | KAS DI BANK | KAS DI BRANGKAS |
1 | Biaya Perkara | 99.860.022 | 17.125.000 | 15.216.000 | 101.739.022 | 98.693.732 | 3.045.290 |
2 | Biaya Eksekusi | 84.575 | 3.000.000 | 35.973.000 | 155.711.575 | 155.711.575 | 0 |
3 | Biaya Konsinyasi | 7.668.044 | 0 | 0 | 7.668.044 | 7.668.044 | 0 |
4 | Uang Titipan Perkara Pidana | 0 | 0 | 0 | 0 | 0 | 0 |
5 | PHI | 0 | 0 | 0 | 0 | 0 | 0 |
Jumlah | 295.882.641 | 20.125.000 | 50.889.000 | 265.188.641 | 262.073.351 | 3.045.290 |
NO | URAIAN | SALDO AWAL | PENERIMAAN | PENGELUARAN | SALDO AKHIR | KAS DI BANK | KAS DI BRANGKAS |
1 | Biaya Perkara | 99.011.022 | 17.265.000 | 16.446.000 | 99.830.022 | 90.805.732 | 9.024.290 |
2 | Biaya Eksekusi | 199.105.575 | 13.000.000 | 23.721.000 | 188.384.575 | 188.384.575 | 0 |
3 | Biaya Konsinyasi | 7.688.044 | 0 | 0 | 7.668.044 | 7.668.044 | 0 |
4 | Uang Titipan Perkara Pidana | 0 | 0 | 0 | 0 | 0 | 0 |
5 | PHI | 0 | 0 | 0 | 0 | 0 | 0 |
Jumlah | 305.784.641 | 30.365.000 | 40.167.000 | 295.882.641 | 286.858.351 | 9.024.290 |
NO | URAIAN | SALDO AWAL | PENERIMAAN | PENGELUARAN | SALDO AKHIR | KAS DI BANK | KAS DI BRANGKAS |
1 | Biaya Perkara | 97.702.022 | 16.895.000 | 16.744.000 | 99.011.022 | 93.076.732 | 5.934.290 |
2 | Biaya Eksekusi | 191.733.575 | 33.000.000 | 37.306.000 | 199.105.575 | 199.105.575 | 0 |
3 | Biaya Konsinyasi | 7.668.044 | 0 | 0 | 7.668.044 | 7.668.044 | 0 |
4 | Uang Titipan Perkara Pidana | 0 | 0 | 0 | 0 | 0 | 0 |
5 | PHI | 0 | 0 | 0 | 0 | 0 | 0 |
Jumlah | 297.103.641 | 49.895.000 | 54.050.000 | 305.784.641 | 2990850.351 | 5.934.290 |
NO | URAIAN | SALDO AWAL | PENERIMAAN | PENGELUARAN | SALDO AKHIR | KAS DI BANK | KAS DI BRANGKAS |
1 | Biaya Perkara | 98.702.022 | 16.075.000 | 14.917.000 | 98.860.022 | 89.739.732 | 9.120.290 |
2 | Biaya Eksekusi | 191.733.575 | 23.150.000 | 11.472.000 | 203.411.575 | 203.411.575 | 0 |
3 | Biaya Konsinyasi | 7.668.044 | 0 | 0 | 7.668.044 | 7.668.044 | 0 |
4 | Uang Titipan Perkara Pidana | 0 | 0 | 0 | 0 | 0 | 0 |
5 | PHI | 0 | 0 | 0 | 0 | 0 | 0 |
Jumlah | 297.103.641 | 39.225.000 | 26.389.000 | 309.939.641 | 300.819.351 | 9.120.290 |
NO | URAIAN | SALDO AWAL | PENERIMAAN | PENGELUARAN | SALDO AKHIR | KAS DI BANK | KAS DI BRANGKAS |
1 | Biaya Perkara | 98.854.022 | 13.400.000 | 14.552.000 | 97.702.022 | 96.484.732 | 1.217.290 |
2 | Biaya Eksekusi | 145.130.575 | 59.000.000 | 12.397.000 | 191.733.575 | 191.733.575 | 0 |
3 | Biaya Konsinyasi | 7.668.044 | 0 | 0 | 73668.044 | 7.668.044 | 0 |
4 | Uang Titipan Perkara Pidana | 0 | 0 | 0 | 0 | 0 | 0 |
5 | PHI | 0 | 0 | 0 | 0 | 0 | 0 |
Jumlah | 251.652.641 | 72.400.000 | 26.949.000 | 297.103.641 | 295.886.351 | 1.217.290 |
NO | URAIAN | SALDO AWAL | PENERIMAAN | PENGELUARAN | SALDO AKHIR | KAS DI BANK | KAS DI BRANGKAS |
1 | Biaya Perkara | 103.606.022 | 15.495.000 | 20.247.000 | 98.854.022 | 91.692.732 | 7.161.290 |
2 | Biaya Eksekusi | 121.847.575 | 26.000.000 | 2.717.000 | 145.130.575 | 145.130.575 | 0 |
3 | Biaya Konsinyasi | 7.668.044 | 0 | 0 | 7.668.044 | 7.668.044 | 0 |
4 | Uang Titipan Perkara Pidana | 0 | 0 | 0 | 0 | 0 | 0 |
5 | PHI | 0 | 0 | 0 | 0 | 0 | 0 |
Jumlah | 233.121.641 | 41.495.000 | 22.964.000 | 251.652.641 | 244.491.351 | 7.161.290 |
NO | URAIAN | SALDO AWAL | PENERIMAAN | PENGELUARAN | SALDO AKHIR | KAS DI BANK | KAS DI BRANGKAS |
1 | Biaya Perkara | 104.503.022 | 6.830.000 | 7.727.000 | 103.606.022 | 95.325.732 | 8.280.290 |
2 | Biaya Eksekusi | 112.524.575 | 10.000.000 | 677.000 | 121.847.575 | 121.847.575 | 0 |
3 | Biaya Konsinyasi | 7.668.044 | 0 | 0 | 7.668.044 | 7.668.044 | 0 |
4 | Uang Titipan Perkara Pidana | 0 | 0 | 0 | 0 | 0 | 0 |
5 | PHI | 0 | 0 | 0 | 0 | 0 | 0 |
Jumlah | 224.695.641 | 16.830.000 | 8.404.000 | 233.121.641 | 224.841.351 | 8.280.290 |
NO | URAIAN | SALDO AWAL | PENERIMAAN | PENGELUARAN | SALDO AKHIR | KAS DI BANK | KAS DI BRANGKAS |
1 | Biaya Perkara | 111.021.022 | 8.350.000 | 14.868.000 | 104.503.022 | 99.721.732 | 4.781.290 |
2 | Biaya Eksekusi | 114.095.575 | 0 | 1.571.000 | 112.524.575 | 112.524.575 | 0 |
3 | Biaya Konsinyasi | 7.668.044 | 0 | 0 | 7.668.044 | 7.668.044 | 0 |
4 | Uang Titipan Perkara Pidana | 0 | 0 | 0 | 0 | 0 | 0 |
5 | PHI | 0 | 0 | 0 | 0 | 0 | 0 |
Jumlah | 232.784.641 | 8.350.000 | 16.439.000 | 224.695.641 | 219.914.351 | 4.781.290 |
NO | URAIAN | SALDO AWAL | PENERIMAAN | PENGELUARAN | SALDO AKHIR | KAS DI BANK | KAS DI BRANGKAS |
1 | Biaya Perkara | 116.043.122 | 12.430.000 | 17.452.100 | 111.021.022 | 111.021.022 | 472.290 |
2 | Biaya Eksekusi | 133.138.575 | 0 | 19.043.000 | 114.095.575 | 114.095.575 | 0 |
3 | Biaya Konsinyasi | 7.668.044 | 0 | 0 | 7.668.044 | 7.668.044 | 0 |
4 | Uang Titipan Perkara Pidana | 0 | 0 | 0 | 0 | 0 | 0 |
5 | PHI | 0 | 0 | 0 | 0 | 0 | 0 |
Jumlah | 256.849.741 | 12.430.000 | 36.495.100 | 232.784.641 | 232.784.641 | 472.290 |
NO | URAIAN | SALDO AWAL | PENERIMAAN | PENGELUARAN | SALDO AKHIR | KAS DI BANK | KAS DI BRANGKAS |
1 | Biaya Perkara | 119.144.122 | 6.160.000 | 9.261.000 | 116.043.122 | 110.440.732 | 5.602.390 |
2 | Biaya Eksekusi | 110.725.575 | 29.000.000 | 6.587.000 | 133.138.575 | 133.138.575 | 0 |
3 | Biaya Konsinyasi | 7.668.044 | 0 | 0 | 73668.044 | 7.668.044 | 0 |
4 | Uang Titipan Perkara Pidana | 0 | 0 | 0 | 0 | 0 | 0 |
5 | PHI | 0 | 0 | 0 | 0 | 0 | 0 |
Jumlah | 237.537.741 | 35.160.000 | 15.848.000 | 256.849.741 | 251.247.351 | 5.602.390 |
NO | URAIAN | SALDO AWAL | PENERIMAAN | PENGELUARAN | SALDO AKHIR | KAS DI BANK | KAS DI BRANGKAS |
1 | Biaya Perkara | 106.734.122 | 23.575.000 | 11.165.000 | 119.144.112 | 117.693.732 | 1.450.390 |
2 | Biaya Eksekusi | 103.489.575 | 10.000.000 | 2.800.000 | 110.689.575 | 110.689.575 | 0 |
3 | Biaya Konsinyasi | 7.668.044 | 0 | 0 | 7.668.044 | 7.668.044 | 0 |
4 | Uang Titipan Perkara Pidana | 0 | 0 | 0 | 0 | 0 | 0 |
5 | PHI | 0 | 0 | 0 | 0 | 0 | 0 |
Jumlah | 217.891.741 | 33.575.000 | 13.965.000 | 237.501.741 | 236.051.351 | 1.450.390 |